Hospitality / Live Plantroom

Keavil House Hotel

Major live energy-centre and boiler plant upgrade delivered while maintaining uninterrupted heating and domestic hot water to the hotel and leisure facilities.

Keavil House Hotel & Leisure ClubClient
DunfermlineLocation
£350kContract value
Live Plant UpgradeProject type
The brief

Upgrade critical plant without interrupting hotel operations.

Heat Wise Innovations was appointed to replace critical plantroom equipment, install new high-efficiency boiler plant and complete extensive mechanical modifications in a fully operational hotel. Maintaining continuous heating and domestic hot water was central to the delivery strategy.

What we delivered

Phased live-energy-centre delivery

Temporary boiler plant

Design, supply and installation of temporary heating and domestic hot-water connections before existing equipment was removed.

New boiler & flue plant

New cascade boiler plant, flue systems and associated mechanical alterations.

Pipework, gas & controls

Primary and secondary heating reconfiguration, gas-service alterations, controls integration and system optimisation.

Testing & handover

Flushing, testing, commissioning, removal of temporary plant, final switchover, client training and O&M documentation.

Outcome

Critical services maintained throughout the works.

The hotel and leisure facilities remained fully operational, with zero loss of heating or domestic hot water to guests during the project. The new plant was installed, commissioned and handed over with improved reliability and resilience.

Planning a live plantroom upgrade?